AUTOMATION
OF SUBSTATIONS

Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Yugo-Zapadnaya substation
Works for the establishment of software and hardware complex of APCS
Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Works for the establishment of secondary systems of Poluprovodniki substation
Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Works under the ERT UNEG programme, 20 substations of BPS of the North-West
Works for the establishment of secondary systems of high-voltage facility Kalininskaya nuclear power plant—Cherepovets, with Cherepovetskaya and Belozerskaya substations
Works under the ERT UNEG programme, 20 substations of BPS of the North-West
Works for the development of control wiring and communication systems within comprehensive technical upgrade and reconstruction of Orlovskaya-Rayonnaya substation
Design development; detailed design development for monitoring system of АТ-1 and АТ-2 of Chertanovo substation
Design development; detailed design development for monitoring system of АТ-1 and АТ-2 of Belyaevo substation
Supply of materials and equipment within comprehensive technical upgrade and reconstruction of Severnaya substation
Works under the programme of Enhancement of Reliability and Traceability of the Unified National Electric Grid (ERT UNEG), 16 substations of Bulk Power Station (BPS) of the Centre
Supply of a package of telecontrol system for the expansion of Kaluzhskaya substation
Works under the programme of Enhancement of Reliability and Traceability of the Unified National Electric Grid (ERT UNEG), 16 substations of Bulk Power Station (BPS) of the Centre
Yablonovskaya substation
Works for the establishment of software and hardware complex of APCS
Comprehensive technical upgrade and reconstruction of R-4 substation, regarding control wiring and communication systems development
Works for the development of control wiring and communication systems within comprehensive technical upgrade and reconstruction of Dagomys substation
Goryachiy Kluch substation
Works for the establishment of DATS
Works for the establishment of software and hardware complex of APCS for substations No. 1, 2 and 3
Pre-commissioning of RPA with АТ-1 replacement within the scope of reconstruction and technical upgrade of Psou substation
Works for the establishment of secondary systems of Mzymta substation
Works for the establishment of the Unified Digital Electric Network (UDEN) node
Scope of work for the establishment of secondary systems within the construction of Ice Stadium substation
Project development: "Establishment of Software and Hardware Complex for Automated Control and Management of Cherkessk Substation"
Shakhty substation
Works for the establishment of telecontrol and ice melt systems
Slavyansk-Krymskaya-2 substation
Supply of relay protection and control equipment
Works on FO data transfer systems for high-voltage facilities Boguchanskaya hydroelectric station—Angara substation and Kamala-1 substation
Works for the development of control wiring and communication systems within comprehensive technical upgrade and reconstruction of Starominskaya substation
Scope of work for the establishment of secondary systems within the construction of Krymskaya-Tsentralnaya 500 kV overhead transmission line with expansion of Krymskaya 500 kV Substation and Tsentralnaya 500 kV Substation
T-10 substation and T-20 substation
Supply of DATS equipment
Works for the establishment of communication systems at NBZ substation
Works under the title: "330 kV high-voltage line Novocherkassk State District Electric Station—P500 "Reconstruction of a 51-km segment of line"
Gumrak substation
Works for the reconstruction of 110 kV line elements No. 8 and No. 11, including replacement of cut-off switches in 110 kV non-enclosed distribution devices
Reconstruction of Chigashevo substation in terms of development of control wiring and communication systems
Pomary substation
Works for the establishment of software and hardware complex of APCS
Scope of work for the establishment of secondary systems within the reconstruction of Ulyanovskaya substation
Worksfor the establishment of secondary systems within the construction of Levoberezhnaya Substation
Integrated technical refurbishment and reconstruction of Kuybyshevskaya substation
Scope of work for the establishment of secondary systems within the construction of Krasnoarmeyskaya substation
Works under ERT UNEG programme, 29 substations of BPS of Ural
Pilot project for the development of a smart grid at the external power supply facilities of Elginskiy coal mining enterprise
Works under ERT UNEG programme, 29 substations of BPS of Ural
Works for the establishment of integrated automation, protection, communication and safety systems of Soboli substation
Yuzhnaya substation
Works for the establishment of software and hardware complex of APCS and communication
Nadezhda substation
A package of innovative solutions based on IEC 61850-9-2 protocol
Kamenskaya substation
Works for the establishment of software and hardware complex of APCS and Process Data Acquisition and Transmission System (PDATS)
Reconstruction of Shagol substation
Development of projects under ERT UNEG programme, 4 substations of BPS of Ural
Kirillovskaya substation
Works for the establishment of APCS and PDATS
Integrated technical refurbishment and reconstruction of Snezhnaya substation in terms of supply and pre-commissioning of relay protection and control equipment
Vasilyev substation
Works for the establishment of APCS
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works for the development of control wiring and communication systems within comprehensive technical upgrade and reconstruction of Elanskaya substation
Vlasikha substation
Works for the establishment of software and hardware complex of APCS
Project development: "Establishment of Software and Hardware Complex for Automated Control and Management of Oznachennoye Substation"
Works for the development of control wiring and communication systems within comprehensive technical upgrade and reconstruction of NKAZ-2 substation
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works for the establishment of distributed package for recording dispatcher communications at the substations of the Amurskoye Bulk Power Systems Enterprise (BPSE) (28 substations)
Engineering works under ERT UNEG programme, 9 substations of BPS of the East
Pilot project for the development of a smart grid at the external power supply facilities of Elginskiy coal mining enterprise
Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Sidorovskaya substation
Works for the establishment of software and hardware complex of APCS, and software and hardware complex of PDATS
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works under ERT UNEG programme, 32 substations of BPS of Siberia
Works for the establishment of integrated automation, protection, communication and safety systems of Emelino substation
Development of projects under ERT UNEG programme, 4 substations of BPS of Ural
Works under ERT UNEG programme, 29 substations of BPS of Ural
Development of engineering documentation and working documentation under the title: "Reconstruction of EC system in the operating zone of Volgogradskoye Regional Dispatcher Administration (RDA) of SO UES"
Vremennaya (Rezervnaya) substation
Works for the establishment of software and hardware complex of APCS
Development of engineering documentation under the title: "Reconstruction of Buzhora 220 kV substation"
Works under the programme of Enhancement of Reliability and Traceability of the Unified National Electric Grid (ERT UNEG), 16 substations of Bulk Power Station (BPS) of the Centre
Works under the programme of Enhancement of Reliability and Traceability of the Unified National Electric Grid (ERT UNEG), 16 substations of Bulk Power Station (BPS) of the Centre
Talashkino substation
Works for the establishment of DATS
Works under the ERT UNEG programme, 25 substations of BPS of the North-West
Works under the programme of Enhancement of Reliability and Traceability of the Unified National Electric Grid (ERT UNEG), 16 substations of Bulk Power Station (BPS) of the Centre

VOLTA Group companies have implemented over 250 integrated projects for establishment of information technology systems.

The objects of automation are located in all Federal Districts of the RF, from the North-West to the Far East.

The company's reference list includes electric power supply facilities for the Sochi-2014 Olympic Games and for the summit of the APEC member states.

Solutions developed by the Group are used at over 150 substations and 12 Grid Management Centres of OJSC Federal Grid Company of Unified Energy System (FGC UES) and JSC MRSK Holding, 11 dispatch centres of OJSC System Operator of the Unified Energy System (SO UES), branch offices of Gazprom Mezhregion LLC, branch offices of JSC RusHydro, etc.